We are privileged to be again participating in Intel DCM Booth at DCD New York on 19th & 20th April, 2016 at Marriott Marquis, Times Square.

We will be announcing our new version GFS Crane DCIM v3.0 with a number of enhancements.

With these enhancements, we will show how GFS Crane is a complete DCIM for Enterprise as well as Colocation Data Centers. We will demonstrate how it helps in Data Center Operations, Planning & Management.

We will demonstrate the integration with Intel Data Center Manager and how that reduces cost of ownership for better capacity planning, power, space and cooling management.

Last month, we did a joint webinar with Intel DCM Group where we showed how GFS Crane mitigates risks of data center failures. Those who missed that may see the recorded version. If you are attending DCD New York, please visit us at the Intel DCM booth to see GFS Crane as a Policy-driven DCIM. Threshold levels for each monitored parameter and SLA terms are defined within the Policies section of GFS Crane DCIM. When a threshold level is breached Active Alerts are sent to designated users via email or text messages or sent as SNMP traps to an ITSM tool. Dashboards and analytic reports provide Data Center Managers key metrics against SLA terms such as average PUE for the month, temperature range and uptime standards for critical devices.

You can read more from a recent case study of GFS Crane DCIM with a telecom operator.